Tanager Energy Inc.: Joffre Well on Production


CALGARY, ALBERTA–(Marketwired – April 7, 2015) – Tanager Energy Inc. (“Tanager”) (TSX VENTURE:TAN), is pleased to report that it has completed the tie-in of its first of 4 wells at its Joffre project. The well was placed on production on April 1 and after 5 days of monitoring and operating facility adjustments it is now producing at a rate of 118 barrels of oil per day and 250 mcf of natural gas, totaling 160 BOE/D. The well is a flowing oil well with a flowing wellhead pressure of 435 psi.

http://ift.tt/1CuoQaR @MasterMetals MasterMetals Blog

from MasterMetals http://ift.tt/1a1FHuP

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s